Mineral Point road work starts Monday - WKOW 27: Madison, WI Breaking News, Weather and Sports

Mineral Point road work starts Monday

Posted:

MADISON (WKOW) -- Spot curb replacement is expected to start on Mineral Point Road Monday, so watch for moving lane closures all week on Mineral Point between Segoe Road and Grand Canyon Drive.

The following Monday, June 17, major traffic delays are expected, especially at peak traffic times, as workers start resurfacing Mineral Point Road. That project includes the following four phases: @

- Resurfacing lanes north of the median between Segoe Road and Rosa Road.

- Resurfacing lanes north of the median between Rosa Road and Grand Canyon Drive.

- Resurfacing lanes south of the median between Grand Canyon Drive and Rosa Road.

- Resurfacing lanes south of the median between Rosa Road and Segoe Road.

Each phase of resurfacing is expected to last approximately one week without weather delays.

Powered by Frankly